GSP 31 has been installed on the Akcakoca platform

November 18, 2010

The drilling rig was installed on deck in one piece. The offshore installation operation was performed safely, observing the most demanding HSE standards.

The self contained modular drilling rig was transported onboard GSP Bigfoot 2 to the location, in Akcakoca perimeter being lifted and installed on the superior deck of the fixed platform by the heavy lift crane barge GSP Neptun, 1800 tons.

The final equipment testing is carried out on board in order to start the drilling operations.