- GSP Offshore - https://www.gspoffshore.com -
GSP Bigfoot 1 and the accompanying convoy have reached the destination in Akcakoca field, for subsea pipelay operations
Posted By admin On F j, Y @ g:i a In News | No Comments
The shallow water pipelay & heavy lift barge was transported to the location. GSP Bigfoot 1 shall start operating immediately in the Turkish territorial waters. The operational schedule has a 14 days extent, and includes the installation of 7 kilometers of 12’’ in diameter subsea gas pipeline.
Two other GSP vessels perform offshore support services for the subsea pipeline installation: GSP Licorn, providing ROV support, and GSP Vega, providing GSP Bigfoot 1 anchor handling.
Article printed from GSP Offshore: https://www.gspoffshore.com
URL to article: https://www.gspoffshore.com/news/gsp-bigfoot-1-and-the-accompanying-convoy-have-reached-the-destination-in-akcakoca-field-for-subsea-pipelay-operations.html
Click here to print.
Copyright © 2009 GSP - Drilling. All rights reserved.