- GSP Offshore - https://www.gspoffshore.com -

GSP was awarded the contract for subsea gas pipelines engineering, procurement, fabrication and installation in Galata field

Posted By admin On F j, Y @ g:i a In News | No Comments

GSP will perform under the present contract engineering, procurement, fabrication and installation of pipelines, 8,5 km x 6’’ from Galata platform to well head Kavarna 2, and 14,5 km x 10’’ from Galata platform to well head Kaliakra 2 with associated piggy backed liquid lines in the Bulgarian continental shelf.

The company will mobilize for the contract a fleet including GSP Bigfoot 1 – the shallow water pipe lay and heavy lift barge, GSP Prince – the new diving and ROV support vessel, specialized vessel for anchor handling assistance of the pipelay barge, two PSVs – GSP Licorn and GSP Perseu, and the crew vessel GSP Lyra.


Article printed from GSP Offshore: https://www.gspoffshore.com

URL to article: https://www.gspoffshore.com/news/gsp-was-awarded-the-contract-for-subsea-gas-pipelines-engineering-procurement-fabrication-and-installation-in-galata-field.html

Copyright © 2009 GSP - Drilling. All rights reserved.