- GSP Offshore - https://www.gspoffshore.com -

GSP Bigfoot 1

Posted By admin On F j, Y @ g:i a In | No Comments

2015-02-25 BF1 Upgrade sea trials (4) [1]

DP2 Derrick Pipelay Barge, heavylift 400 mT offshore mast crane, 60 mT pipe handling crane, classified under ABS register, LOA (excluding stinger) 135.00 m, 6x2200kW Rolls Royce Azimuth Thrusters, 8 point Mooring Winches, KONGSBERG DP System, KONGSBERG HiPAP 500 system, 200 mT pipelaying capacity, 6×50 mT Pipe Repair Davits, A&R Winch capacity of 200MT, three sections-90m Stinger, helideck–Sikorsky S-61N & S-92 with refueling system, 150HP ROV, accommodation 240 POB, Built in 2010 in GSP Shipyard, upgraded in 2015.

Relevant missions: pipelay, heavy lift works. The pipelay system is based on the single joint S-lay principle. The barge is capable of installing  6” to 60” diameter pipelines.

For more details about GSP Bigfoot 1, please download the technical presentation below.

[2]
GSP Bigfoot 1 [2] GSP BIGFOOT 1.pdf
5.4 MiB 10313 Downloads Details... [3]


Article printed from GSP Offshore: https://www.gspoffshore.com

URL to article: https://www.gspoffshore.com/the-fleet/construction-vessels/gsp-bigfoot-1

URLs in this post:

[1] Image: http://www.gspoffshore.com/wp-content/uploads/2015/03/2015-02-25-BF1-Upgrade-sea-trials-4.jpg

[2] Image: https://www.gspoffshore.com/download/GSP BIGFOOT 1.pdf

[3] Details...: #

Copyright © 2009 GSP - Drilling. All rights reserved.