You are here:
GSP Offshore >
News > GSP was awarded the contract for subsea gas pipelines engineering, procurement, fabrication and installation in Galata field
GSP was awarded the contract for subsea gas pipelines engineering, procurement, fabrication and installation in Galata field
October 16, 2009
GSP will perform under the present contract engineering, procurement, fabrication and installation of pipelines, 8,5 km x 6’’ from Galata platform to well head Kavarna 2, and 14,5 km x 10’’ from Galata platform to well head Kaliakra 2 with associated piggy backed liquid lines in the Bulgarian continental shelf.
The company will mobilize for the contract a fleet including GSP Bigfoot 1 – the shallow water pipe lay and heavy lift barge, GSP Prince – the new diving and ROV support vessel, specialized vessel for anchor handling assistance of the pipelay barge, two PSVs – GSP Licorn and GSP Perseu, and the crew vessel GSP Lyra.
Related pages
Latest News
- January 18, 2023:
GSP Offshore is the Partner of the Black sea fLoating Offshore Wind (BLOW) Project, co-funded by the European Union
- September 19, 2022:
GSP commences drilling operations in SASB gas field, offshore Turkey
- May 19, 2022:
GSP Announces Signing of Drilling Contract with Canada-based Oil & Gas Producer, Trillion Energy
- September 13, 2021:
Important milestone for Midia Gas Development project
- March 31, 2021:
Grup Servicii Petroliere: Primul jacket din perimetrul românesc al Mării Negre a fost instalat de echipele GSP, la peste 120 km de țărm
- March 11, 2021:
GSP FALCON: Operațiune de salvare pe mare
- August 4, 2020:
New milestone in the MGD project for BSOG – topside fabrication
- February 26, 2020:
GSP refloated the Queen Hind. The ship is now docked firmly into place at Midia Harbor
- July 29, 2019:
GSP signs an integrated services contract with OMV Petrom
- July 15, 2019:
GSP enters the deep-water drilling market