You are here:
GSP Offshore >
News > New heavy lift operation successfully completed by GSP Shipyard
New heavy lift operation successfully completed by GSP Shipyard
June 8, 2012
GSP Shipyard completed a new heavy lift operation with the simultaneous support of two heavy lift cranes in its facility in Midia Port.
Two LR 1300 crawler cranes were mobilized and performed a complex heavy lift operation of a 100 tons and 17 meters long project cargo worth approximately 1 USD mil. The equipment is part of a local refinery processing capacity enhancement project.
The 100 tons oil plant unit was shipped from Constanta Shipyard to Midia Port where the heavy machinery department executed the transfer of the equipment from the vessel on a trailer 24 meters long.
The engineering of the lifting operation was part of the heavy lift project service. The operation was completed with the highest regard to all safety and environmental aspects according to the initial plan. GSP Shipyard’s Heavy Machinery has an extensive experience in engineering and performing heavy lift operations, the service offer including the heavy lift project management, in-house lifting engineering and comprehensive operations and safety procedures, onsite coordination, heavy lift logistics, full loading, unloading, and rigging.
Related pages
Latest News
- January 18, 2023:
GSP Offshore is the Partner of the Black sea fLoating Offshore Wind (BLOW) Project, co-funded by the European Union
- September 19, 2022:
GSP commences drilling operations in SASB gas field, offshore Turkey
- May 19, 2022:
GSP Announces Signing of Drilling Contract with Canada-based Oil & Gas Producer, Trillion Energy
- September 13, 2021:
Important milestone for Midia Gas Development project
- March 31, 2021:
Grup Servicii Petroliere: Primul jacket din perimetrul românesc al Mării Negre a fost instalat de echipele GSP, la peste 120 km de țărm
- March 11, 2021:
GSP FALCON: Operațiune de salvare pe mare
- August 4, 2020:
New milestone in the MGD project for BSOG – topside fabrication
- February 26, 2020:
GSP refloated the Queen Hind. The ship is now docked firmly into place at Midia Harbor
- July 29, 2019:
GSP signs an integrated services contract with OMV Petrom
- July 15, 2019:
GSP enters the deep-water drilling market