Вы находитесь здесь:
GSP Offshore >
новости > New milestone in the MGD project for BSOG – topside fabrication
New milestone in the MGD project for BSOG – topside fabrication
Август 4, 2020
Our teams are hard at work to meet the highest quality standards in our EPCI project for Black Sea Oil and Gas.
The Midia Gas Development project reaches a new milestone, with the first 127 T cellar deck being centered and welded into place, after a carefully coordinated lifting operation.
Please watch the video below, and see the two Liebherr cranes carefully lift, move, and position the deck in our Agigea base.
Полезные страницы по теме
Последние новости
- Январь 18, 2023:
GSP Offshore is the Partner of the Black sea fLoating Offshore Wind (BLOW) Project, co-funded by the European Union
- Сентябрь 19, 2022:
GSP commences drilling operations in SASB gas field, offshore Turkey
- Май 19, 2022:
GSP Announces Signing of Drilling Contract with Canada-based Oil & Gas Producer, Trillion Energy
- Сентябрь 13, 2021:
Important milestone for Midia Gas Development project
- Март 31, 2021:
Grup Servicii Petroliere: Primul jacket din perimetrul românesc al Mării Negre a fost instalat de echipele GSP, la peste 120 km de țărm
- Март 11, 2021:
GSP FALCON: Operațiune de salvare pe mare
- Август 4, 2020:
New milestone in the MGD project for BSOG – topside fabrication
- Февраль 26, 2020:
GSP refloated the Queen Hind. The ship is now docked firmly into place at Midia Harbor
- Июль 29, 2019:
GSP signs an integrated services contract with OMV Petrom
- Июль 15, 2019:
GSP enters the deep-water drilling market